Free contractor tool
Xactimate missed line items checklist.
Check a carrier’s Xactimate estimate against the operations most often left out. Eight quick checks per trade, an instant result, and no email required.
1. Pick the trade
Roofing: is each of these in the carrier’s estimate?
Tear-off of every existing layer, plus disposal
Second layers and haul-off are easy to drop when only the new roof is priced.
Underlayment for the roof being installed
The finish shingle is listed, but the layer beneath it is not.
Starter course and ridge or hip cap
Some items include them and some do not. Check the item detail before assuming either way.
Drip edge or edge metal on the affected eaves and rakes
Edges are measured in linear feet, separate from the roof area.
Flashing at walls, chimneys and transitions
Step and counter flashing are often missing where the roof meets a wall.
Pipe jacks, vents and other penetrations
Penetrations are counts, not area, and get skipped when only squares are entered.
Steep, high-roof or access charges where they apply
Pitch and height affect labor, but only when the slope and stories are documented.
Gutters, satellite, solar or other items that must come off
Connected trades and detach-and-reset items sit outside the roof area.
Reconstruction: is each of these in the carrier’s estimate?
Floor protection, masking and dust control
Occupied homes need protection the estimate rarely shows.
Detach and reset of items blocking the repair
Toilets, vanities, appliances, trim and fixtures often block the damaged finish.
Demolition labor and debris haul-off
A removal line can miss the labor or the disposal that goes with it.
Preparing the exposed surface before the new finish
Prep work is a separate operation from installing the finish.
Every layer of the wall or ceiling rebuilt
Insulation, drywall, tape, texture, primer and paint are separate steps.
Transitions to the next room or surface
Repairs have to stop at a sensible break, which often extends past the damage.
Baseboard, casing and trim replaced or reset
Trim gets missed when only the wall or floor is priced.
Final cleanup and any testing or startup
Closeout work is easy to leave off the end of the job.
Water mitigation: is each of these in the carrier’s estimate?
Drying equipment by unit, room and dates
Equipment needs documented placement and removal dates to support the days billed.
Daily monitoring and moisture readings
Monitoring visits and readings are separate from the equipment itself.
Removal of wet materials with measured quantities
Drywall cuts, baseboard and pad need measured amounts, not whole-room guesses.
Antimicrobial application on affected areas
Treatment of exposed surfaces is often left off.
Moving contents out of the way and back
Content handling takes labor, especially in furnished rooms.
Containment or protection where it was set up
Barriers and protection need to be in the records to be included.
Cleaning of affected surfaces
Cleaning is a distinct step from removal and drying.
After-hours or emergency response, if the records show it
Emergency timing only counts when the job records document it.
A missing line isn’t automatically owed. Each one needs photos, measurements or field records that support it for this job. That’s what the free gap check confirms.
Built from SaguaroScope’s reviews of roofing, reconstruction and mitigation files. See commonly missed reconstruction operations, roofing scope gaps and mitigation documentation gaps.