SaguaroScope · Contractor-side estimating

Xactimate estimate writing services for contractors.

Give your estimate writer a defined repair scope. We turn it into a Xactimate estimate, sketch, editable ESX file and PDF for your review. Start with a callback—no files needed.

Our Xactimate estimate writers support roofing and reconstruction contractors nationwide. For water damage jobs, mitigation estimating follows a separate service schedule. We confirm the records needed, price and delivery date before work begins. Your team checks field conditions and approves the finished file.

Defined-scope writing · Editable ESX files · Contractor-controlled submissions

The right assignment

A defined scope. A usable Xactimate file.

Estimate Only: Estimate + Sketch Only. No F9 Notes. Use this service when your team knows which repairs to include. We write the estimate and sketch from your scope and measurements. You do not need an insurance carrier’s estimate to start.

Roofing estimates

Provide roof measurements, material and system details, photos, and the operations you want included. Identify access conditions and connected work so the estimate reflects your scope.

Interior & reconstruction

Provide room dimensions, affected materials, quantities, finish details and the repair sequence. Separate rooms and trades clearly enough to support the requested line items.

Water mitigation

Water estimate writing uses a separate service schedule. Send documented field work, measurements, photos, drying logs, equipment records and moisture mapping. An insurer-written estimate is not required.

Explore water estimating →

When the assignment is to find and support missing work in an existing carrier estimate, review our scope-gap documentation service · Choose the right estimate-review service. We route the file based on what it needs; you do not have to choose a package before sending it.

Before you outsource

Match the estimate-writing assignment to the work you need.

A new estimate from your scope

Use Estimate Only when your team has defined the roofing or reconstruction work. We write the accepted operations and quantities; an existing carrier estimate is optional. See estimating from a scope and photos.

Missing work in an existing estimate

Identify the disputed operation and its supporting field records. F9 Documentation is a separately accepted add-on to roofing or reconstruction writing; it is not included in Estimate Only.

Inspect anonymized real Xactimate estimate samples from a 319-item reconstruction estimate and a 443-item fire-cleaning estimate. The public excerpts retain actual operations and quantities, with selected scope notes shortened for review. Client identities and pricing are removed.

Use the ESX, PDF and sketch deliverables guide to compare the handoff. Estimate Only includes the estimate and corresponding sketch without F9 notes; the notes in these samples illustrate separate documentation work.

Before you outsource

What should you compare when hiring Xactimate estimate writers?

A useful estimate-writing quote tells you what the writer will prepare, what your team must provide and what happens when the scope changes. Compare those details together. A low starting price, a long list of possible repairs or a large estimated total does not tell you whether the assignment fits your project.

Questions to settle before estimate preparation begins
Ask aboutConfirm for your file
The starting scopeAre you supplying a defined repair scope, or asking for missing work to be investigated and supported? Those are different assignments.
Working filesConfirm the editable ESX, review PDF and corresponding sketch, and identify which deliverables apply to the accepted service.
Supporting documentationAsk whether F9 notes, code research or other technical support are included. SaguaroScope Estimate Only does not include them.
Measurements and unknownsIdentify the source of dimensions and the person who will resolve missing information or confirm field conditions.
Price, timing and revisionsConfirm the accepted fee, delivery target and revision terms before production. A requested deadline is not a confirmed delivery date.
The next stepConfirm who approves the file and who communicates with the carrier. Estimate writing alone does not authorize carrier communication.

Use our estimate deliverables guide to compare the handoff, or identify the right review service when the repair scope still needs work.

Published fixed fees

Know the pricing basis before you commit.

Estimate Only · Roof

$179 / $214 / $249

Simple / Moderate / Complex

Estimate + Sketch Only — No F9 Notes.

Estimate Only · Interior

$299 / $449 / $599

Simple / Moderate / Complex

Estimate + Sketch Only — No F9 Notes.

Water mitigation

$149 / $249 / $399

Simple / Standard / Expanded

Separate water writing schedule. Limited review: $99. No writing deposit; payment at handoff before final release, unless approved periodic billing applies.

These are workload classifications, not measures of claim value or automatic entitlements. SaguaroScope confirms the complete assignment’s classification before work begins. Estimate Only includes an estimate and corresponding sketch only. F9 notes, code arguments, manufacturer documentation, advanced technical positions, embedded claim photographs or photo reports, supplement arguments, carrier submission, carrier correspondence, adjuster negotiation and Carrier Technical Coordination are excluded. Water payment, revision and review-credit rules remain separate.

Read the full pricing and service terms →

Add F9 Documentation when the file needs support.

F9 Documentation is an add-on to the roofing or reconstruction estimate. Accepted notes are written into the relevant Xactimate line items and delivered with the estimate. SaguaroScope assigns the Simple or Advanced documentation level after reviewing the complete file; you accept the terms before work begins.

Standard accounts pay the base estimate fee at handoff before final release. The later F9 progressive fee or applicable minimum is billed separately after you report the final carrier settlement or approval and we verify it. No estimate-fee credit, upfront F9 deposit or handoff F9 minimum applies. Approved periodic accounts follow their agreed schedule.

Technical coordination is a separately authorized service for eligible F9 assignments or SaguaroScope-written mitigation estimates. Your company approves the package before any authorized transmission.

Explore F9 Documentation services →

Before preparation

Send the facts behind the scope.

After the callback, send the records that show the work you need estimated. Tell us what is missing.

  • Your company contact and project location.
  • A written scope showing what to include and exclude.
  • Measurements, room or roof diagrams, and quantities.
  • Photos tied to the affected area, material or operation.
  • Any existing estimate and relevant product or project documents.
  • For water files, job status, drying logs and equipment records when available.

The sketch uses your measurements. It cannot confirm hidden damage or replace a site measurement. If a dimension or repair detail is missing, we ask your team to confirm it.

Request a callback

Your team's handoff

Review, approve, then submit.

  1. Confirm the assignment. We check fit and identify missing information before accepting production.
  2. Agree on scope and price. The accepted order defines deliverables, documentation, revisions and timing.
  3. Prepare the estimate and sketch. We organize and check the accepted operations and quantities against the supplied records.
  4. Receive the agreed files. Review the PDF, editable ESX, corresponding sketch and any included documentation or open questions. Corrections and added scope follow the accepted revision terms.
  5. Keep control. Your company verifies field facts, reviews and approves the file, and controls homeowner communication. Any Carrier Technical Coordination must be authorized by written Service Order and use client-approved technical materials.

Learn how an editable ESX file supports that handoff, and when F9 notes belong in the assignment.

A practical starting point

Copy this scope handoff template into your project notes.

Use the same area names in your scope, measurements and photo filenames. Copy the template below, repeat the area section as needed, and leave unknown facts marked for confirmation. You can request a callback before gathering any files.

PROJECT
Contractor company:
Contact who can answer scope questions:
Project address and work type:
Requested completion date, if any:

WHAT WE NEED
Estimate writing from our defined scope, or help reviewing an existing estimate:
Existing estimate filename, date and version, if available:
Work to include:
Work to exclude:

AREA RECORD — REPEAT FOR EACH ROOM OR ROOF AREA
Area name used in the sketch and photos:
Observed condition:
Repair operation our team is requesting:
Material, thickness, finish or system, if known:
Measurement, unit and source:
Related photo or document filenames:
Access, connected work or sequencing information:
Facts still requiring field confirmation:

FILES AND FOLLOW-UP
Scope and measurement files supplied:
Photos and other project records supplied:
Information still missing:
Person responsible for each open question:

This is a preparation aid, not an order form, required list of repairs or authorization to begin work. Water mitigation needs its own field records and separate estimating service; use the applicable drying and equipment documentation rather than treating this repair-scope template as a complete water file.

Separate what was measured from what should be repaired.

For example, a measured wall opening and the area needing paint may be different quantities. Record each operation separately, identify its measurement source, and flag any finish or access question your field team has not resolved. Do not reuse one number across every line simply because the work occurs in the same room.

That is an instructional example, not a recommended repair scope or a promise that a line item will be approved. See more annotated scope examples and our guide to estimating from scope notes and photos.

Before your team uses the file

Review the estimate, PDF and sketch as one assignment.

Check the project identity and version first. Then follow an area from the source records to the sketch and estimate. Confirm that the operation, material, quantity and unit describe the repair your team intended. Keep unanswered field questions visible rather than treating them as completed verification.

The PDF is the readable review copy. The ESX is the editable Xactimate project. For roofing and reconstruction Estimate Only, the corresponding sketch represents the supplied measurements. Receiving those files does not establish hidden conditions or add documentation services that were not ordered.

Send feedback as a clear list tied to rooms or estimate lines. Distinguish a drafting correction from newly discovered damage, revised measurements or additional work so the next step can follow the accepted revision terms. Your company verifies the field facts and approves the finished file.

For a fuller review sequence, read how to read and check a Xactimate estimate. Ready to discuss an assignment? Request a callback; no files or payment are needed to make the request.

Questions before we talk

Xactimate estimate-writing questions.

Can I send my scope and get an estimate and sketch back?

Yes. SaguaroScope Estimate Only includes a project-specific Xactimate estimate and corresponding sketch built from the accepted contractor-defined scope and adequate measurements. Writing deliverables include editable ESX and a review PDF. We confirm the inputs and price before production.

What measurements do you need for the sketch?

Provide room or roof dimensions, area labels and relevant geometry, with photos and material details tied to the scope. An available sketch, diagram or measurement report can support the file. Missing dimensions are questions for the contractor, not facts inferred from a photograph.

Can I outsource just one Xactimate estimate?

Yes. Send one appropriate file for fit and completeness review. We confirm scope, price, required records and delivery before accepting production. Sending an inquiry does not authorize work or a charge.

Do I need an insurance company estimate first?

No. A sufficiently defined contractor repair scope and supporting measurements can be estimated without a carrier estimate. Comparison work and percentage-based F9 documentation require their relevant baseline and compensation basis; water mitigation writing uses field records without an insurer-written estimate.

Does the estimate-and-sketch service include F9 notes?

Estimate Only includes no F9 notes. F9 Documentation can be added to eligible roofing or reconstruction work and delivered in the estimate. The base estimate fee and later F9 percentage/minimum fee are fully separate, with no estimate-fee credit.

How are price and turnaround confirmed?

We review your scope, records and our current workload, then confirm the price and delivery date. Missing measurements or added work can change the schedule. Your accepted order sets payment, revisions and deliverables.

Who approves and submits the finished estimate?

The contractor verifies field facts and approves the final estimate. SaguaroScope does not determine coverage, represent the insured, negotiate settlements or guarantee approval. Separately authorized technical coordination may transmit and explain the client-approved package; the contractor retains control of submission and homeowner communication.

Reviewed October 25, 2026 · SaguaroScope Editorial

Start with a conversation

Put your scope to work.

Request a callback with your name, phone number and email. We’ll discuss the appropriate estimating service, then confirm scope, price and required records before accepting production.