CONTRACTOR FILE CHECKLIST
What should you send an outside Xactimate estimator?
Send the property and contractor contact, the result you need, your defined scope, measurements or sketch, and supporting photos. Add the trade-specific records below and any existing estimate relevant to the assignment. Identify what is missing rather than inventing it. SaguaroScope checks the file for fit and completeness before confirming production; a carrier estimate is not required for defined-scope writing or expected for mitigation.
SaguaroScope · Editorial guide reviewed
Include these basics with every file
- Property address and the name, email and phone number of the contractor contact who can resolve scope questions.
- Requested result: a written estimate, writing with F9 documentation, or an eligible existing mitigation-estimate review.
- A short scope identifying locations, operations, materials, inclusions and exclusions. Note whether the work is planned, in progress or completed.
- Measurements or a legible sketch with units and room, roof-area or elevation names.
- Photos and records that support the conditions and quantities being described.
- Any existing estimate or relevant carrier baseline, with its author, date and version. Include the native ESX if available.
- Known deadline, open decisions and missing information. A requested date still needs to be accepted.
Roofing: geometry plus the roof scope
- The complete roof measurement report or usable roof sketch, identifying the correct structure and included slopes.
- Existing and proposed roofing materials, plus included components and operations your team has evaluated.
- Overall and close-up photos connected to the roof areas or details in question.
- Verified field conditions affecting the accepted work, along with excluded structures or components.
- The latest written carrier estimate when a carrier-baseline comparison or applicable F9 fee basis is part of the assignment.
Reconstruction: a scope for each affected area
- Room-by-room scope with the affected surfaces and measured repair boundaries.
- Dimensions, ceiling heights and relevant openings or fixed features.
- Material descriptions and the planned removal, replacement, preparation and finishing operations.
- Photos showing conditions, transitions and the relationship between affected and adjacent areas.
- Records of work already performed, exclusions and any mitigation/reconstruction operation that needs an overlap check.
Water mitigation: the actual work and field records
Mitigation writing starts with the contractor’s field documentation. An insurer-written estimate is not expected. Keep dates and area names consistent across the records.
- Job status, work dates, affected rooms, levels and drying-zone information recorded by the contractor.
- Measurements or sketch and photos showing the documented work and relevant conditions.
- Drying logs, moisture mapping and supporting readings.
- Equipment logs showing the actual equipment, locations, placement/removal dates and changes.
- Completed operations and measured quantities, with explanations for gaps or inconsistent records.
- For Limited Estimate Review, the existing contractor estimate to be reviewed, with its supporting field records.
Existing-estimate questions: identify the version and concern
Send the current PDF and ESX if available. Point to the line, page or area in question, describe the discrepancy and attach the record that supports it. A higher or lower total alone does not explain what needs to change.
Roofing and reconstruction files route into the applicable writing and F9 services; there is no separate standalone custom-priced review offer for those trades. The limited mitigation review has its own scope and output. Use the service-routing page to choose the result you need.
Upload together, then resolve what is missing
You can upload the available records together. Consistent area names and a short scope make the handoff clearer; you do not need to rename or label every photo before asking for a fit check. Tell staff which version is current and which details still need confirmation.
Share files through the portal or agreed intake route and only include information needed for the assignment. If an input format is not offered by the upload screen, tell the team what you have rather than changing the filename extension.
Staff checks the records and confirms the service, fee, required follow-up and delivery target. The PSO or applicable standing annual terms authorize the work. Standard writing fees are due at handoff before final release; standard limited mitigation review is paid before review begins. Approved periodic clients follow their agreed terms.
F9 notes, when accepted with roofing or reconstruction writing, are included in the delivered estimate. The later verified-outcome F9 percentage or minimum is separate from the base estimate fee, with no estimate-fee credit. Your company verifies field facts, approves the deliverables and controls submission; SaguaroScope does not determine coverage, represent the insured, negotiate settlements or guarantee approval. Remote work remains subject to service-area availability and file fit.
Questions contractors ask
Do I need every document before I contact you?
Send the records you have for a fit check and identify what is missing. Staff confirms which information is necessary before production; an incomplete file does not justify guessed measurements or work dates.
Do I need an insurance estimate first?
Not for writing a defined contractor scope, and mitigation does not expect one. Send the written carrier baseline when the accepted assignment depends on a comparison or F9 fee basis.
Do I have to label every photo?
No. Upload the records together. Helpful room or area names and a short scope make review easier, but you do not need to rename every image to begin.
What if I have a PDF but no ESX?
Send the readable PDF and supporting records. Staff confirms whether the accepted writing assignment requires recreating editable estimate information.
What is most useful when the estimate seems wrong?
Identify the current estimate version, the specific page or line, the issue and the record supporting your concern. That gives the team a focused question instead of a total-only comparison.
Can you fill in missing drying logs or equipment dates?
No. Those facts must come from the contractor’s actual field records. Identify gaps so staff can determine what is needed and whether the requested assignment can proceed.